Project Description
The scope of this project is to modify the existing wastewater treatment plant with BDP process. The infullent of the plant comes from both municipal and industrial sources.
Process flow before upgrading: coarse grid + pump station + fine grid + grit chamber + A/O + BAF tank + Second sediment tank + UV disinfection
Project Details
Client Tianjin Water Supply Group
Completion Date (not available)
Treatment Capacity 10,000 m³/d (2,640,000 gpd)
Process Flow Grid + BDP Basin + Chemical Phosphorus Removal Basin + UV Disinfection
Key Words High NH3-N, TN, Industrial and Municipal Wastewater
Parameters and Facts
- CODCr 250~500 mg / L
- BOD5 100~200 mg / L
- SS 100~200 mg / L
- NH3-N 60~270 mg / L
- TP 5~9 mg / L
- CODCr 100 mg / L
- BOD5 20 mg / L
- SS 30 mg / L
- NH3-N 45 mg / L
- TP 2.5 mg / L
- CODCr <50 mg / L
- BOD5 <5 mg / L
- SS <10 mg / L
- NH3-N <1 mg / L
- TP <1 mg / L
Interested in BDP Technology?
Contact us for a free consultation, or explore more reference projects.
NEWSLETTER SIGN UP
Sign up for the BDP EnviroTech Newsletter.
Stay informed about ongoing BDP projects, events and company announcements, and get useful tips to help you reduce operating and discharge costs at your wastewater treatment operation.